Project Case Study | |||||||||||||||
Robertson Versacor protected metal roof and wall cladding has been supplied and installed as a Single Responsibility contract for the major elements of Singapore's Tuas ‘A', Stage 1 power station in the south west of the island. Robertson has produced and installed more than 69,000 square metres of roof and wall cladding to the boiler house, turbine building, switch house, stores, workshops and walkways. The boiler house incorporates Robertson's proven ventilation through a 120 metre long, roof-mounted Robertson Ultra-Flow ventilation unit. Robertson Formawall panel was used for the pump house and water treatment building. |
| ||||||||||||||