Description: HH Robertson has recently completed a three-stage ventilation upgrade to the Port Kembla Copper smelting and refining site in NSW.
Robertson was contracted to design, construct and install a total of 153 lineal metres of Ultra-Flow ventilators to the MIC Building, Anode Furnace and Loft Area of the plant.
Due to site access limitations and the tight schedule, the Robertson Ultra-Flow ventilators, complete with dampers and pneumatic operating gear, were assembled off-site in 8 metre modules, then trucked to site and lifted into position by a 200 tonne crane.