HH ROBERTSON ASIA/PACIFIC GROUP

Project:
Client:
Builder:
Completed:

LAMMA POWER STATION COAL JUNCTION TOWERS, Hong Kong
Hong Kong Electric
Hong Kong Electric
December 2000

(mouse over for alternate photo)

Description:
Robertson has recently completed the refurbishment of four coal junction towers at Lamma Power Station. The power station authorities selected Robertson products and services to replace the existing cladding supplied by others, which had faded and corroded. Robertson cladding had previously been utilised for the turbine buildings and other ancillary buildings at the site.

The refurbishment contract required more than 6,500 square metres of Robertson Box Rib cladding, finished with Robertson's proprietary Versacor multi-layered coating system to both sides of the sheet.

Robertson also supplied UV-resistant translucent panels, louvres, stainless steel doors, powered ventilation systems, supporting girt and cable replacements to the project, all under a Single Responsibility contract.

Ventilation